Construction Management

Licensed General Contractor|CSLB #1007735|Bonded & Insured|24 Years Experience

When a project requires full construction management from early feasibility through completed construction, BCG provides phased delivery under a single principal. The engagement model is construction management at risk: BCG is involved during design, develops the budget from competitive trade bids, and delivers the project under a Guaranteed Maximum Price with open-book cost transparency.

This is the delivery model for ground-up custom homes, major renovations, and complex residential projects on hillside, coastal, and technically challenging sites across Pacific Palisades, Malibu, Hollywood Hills, Brentwood, and the greater LA Westside. Many of these relationships begin with a focused engagement or feasibility report and expand as the project develops.

How CMAR Delivery Works

Construction management at risk differs from traditional design-bid-build by involving the builder during design rather than after permit. BCG works alongside your architect through schematic design, design development, and construction documents, providing market-validated budgets at each milestone. When the design is complete, the Guaranteed Maximum Price is built from competitive trade bids and a detailed cost model. BCG then delivers the project, holding the contractor's license, the trade contracts, and liability for the outcome. All costs are open-book at actual market rates.

Phase 1

Project Feasibility Report

Deliverable
15-20 page report with appendices
Timeline
3-4 weeks from signed engagement
Investment
$17,500

For owners planning ground-up construction, major renovation, or significant site work on a complex property, the feasibility report is the most comprehensive initial engagement. It is a standalone paid engagement with no commitment beyond the report itself. Many owners use the findings as the basis for architect selection, design direction, and budget planning before deciding on further work.

We evaluate nine areas that drive cost, schedule, and risk:

01

Site Conditions and Logistics

Access routes, staging feasibility, equipment positioning, erosion control, and neighbor exposure

02

Geotechnical and Foundation

Soils report review, foundation implications, shoring requirements, spoils estimates, and dewatering

03

Grading and Earthwork

Preliminary cut/fill analysis, export and import assessment, haul routes, and building pad strategy

04

Permitting and Agency Pathway

Jurisdiction mapping, Hillside Ordinance review, VHFHSZ and WUI triggers, permit sequence, and timeline

05

Utility Assessment

Power service requirements, transformer needs, Edison or LADWP coordination, water, gas, and sewer

06

Environmental and Compliance

Protected species, tree protection, fire zone considerations, and AQMD abatement triggers

07

Preliminary Cost Assessment

Cost benchmarks from comparable projects, major cost driver identification, and budget range by building component

08

Long-Lead Identification

Schedule-controlling items, procurement timelines, early specification needs, and vendor lead time flags

09

Risk Assessment

Key risks identified with cost and schedule impact, critical owner decisions, and contingency recommendations

The report concludes with a preliminary budget range and recommendations for next steps. Available for any residential project involving site, permitting, structural, or regulatory complexity.

Phase 2

Design-Phase Construction Management

Basis
Hourly, with monthly reporting
Timeline
Concurrent with design development
Deliverable
GMP proposal, cost model, schedule

We work alongside your architect through schematic design, design development, and construction documents. At each milestone, we provide market-validated budget updates so you always know what the current design costs to build.

Budget Development. Cost modeling at each design milestone with current subcontractor pricing. We identify cost drivers early, when the architect can still respond in the design.

Constructibility Review. We review drawings from a builder's perspective, identifying details that will create field problems or unnecessary cost before they become change orders.

Value Engineering. Where design exceeds budget, we identify alternatives that achieve the architectural intent at lower cost. Spending where it matters, smarter delivery everywhere else.

Subcontractor Prequalification. We vet and prequalify trade contractors for each scope. We know who performs, who holds schedule, and who stands behind their work.

Critical Path Scheduling. The construction schedule is developed during design, not after permit. That means identifying the sequence, procurement deadlines, and activities that control the timeline.

GMP Development. A Guaranteed Maximum Price proposal built from competitive trade bids, a detailed cost model, and a defined scope of work. Complete transparency into how every dollar is allocated.

Phase 3

Project Delivery

Contract
Guaranteed Maximum Price, open-book
Basis
Trade costs at actual, CM fee as %
Deliverable
Completed project with warranty

We execute construction from demolition through certificate of occupancy. The same team that planned and priced the project builds it, managing every trade, every inspection, and every phase of field work through completion.

Site Leadership. The principal is directly involved in field decisions, subcontractor coordination, cost management, and owner communication throughout construction. A superintendent provides daily on-site quality verification, inspection coordination, and safety oversight. This is direct engagement, not periodic check-ins.

Administration and Accountability. We hold the contractor's license (CSLB #1007735), sign the trade contracts, and carry liability for project delivery. Administration includes insurance compliance, lien releases, draw documentation, punch list, final inspections, certificate of occupancy, warranty documentation, and as-built records.

Trade Procurement. We competitively bid, scope-level, and award every specialty trade: concrete, shoring, steel, MEP, roofing, waterproofing, glazing, plaster, flooring, millwork, landscape, hardscape, pool, and specialty systems. Subcontractors are prequalified before they bid and managed under executed contracts through completion.

Cost Control. Real-time tracking against the GMP with monthly reports covering committed costs, projections, change orders, and contingency status. All costs open-book.

Schedule Management. Weekly updates, look-ahead planning, and proactive delay identification. We manage the critical path, not just report on it.

Quality Control. Continuous inspection against contract documents. We identify deficiencies in real time, not at punch list.

Field Execution. We self-perform construction scope with our own crews and equipment. Depending on the project, that includes demolition, site clearing, grading and earthwork, trenching, rough and finish carpentry, framing, fence and gate construction, exterior painting, and general site work. We operate our own skid steers for grading, demolition, and material handling. A foreman is on site daily with a labor crew of four to six workers, expandable as the project requires.

Open-book cost-plus means you see every cost at actual market rate. The GMP caps your total exposure. If the project comes in under, the savings are shared per the contract terms.

Tell Us About Your Project

Whether you are in early planning, active design, or ready to build, we will help you determine the right starting point.